With twenty nine BP service stations across regional Victoria, Vantage Fuels were interested in reducing their energy consumption and carbon emissions.
As installations were completed in petrol stations, specific safety measures were undertaken to reduce risk in the highly combustable sites. Vehicles entering and exiting the stations further complicated the installations. All sites had to be well lit to make the stations eye-catching and prominent in the evenings.
For increased safety, Cherry completed all rail cuttings and other work off site to minimise risk at the stations. Traffic control was necessary to ensure panels were transported and installed without interference from vehicles. Motion sensors were fitted to lighting to maximise power savings.
The installations spanned 14 sites with over 966 lights upgraded to LED and a 30kW solar PV system installed at Mansfield station. Vantage Fuels now save a massive $91,907, 505,363 kg CO2 and 537,128 kWh per annum, equivalent to removing 107 vehicles off the roads for one year or 8,356 seedlings grown for ten years!
CASE STUDIES
Related projects.
LATEST NEWS
Ours insights& creative ideas
Check out the latest in Cherry news from our newest projects to industry insights.
Supplied Products







