MDI were looking to reduce CO2 emissions and energy costs at their large premises in Scoresby, Victoria.
Cherry Energy Solutions worked with MDI to obtain landlord approval for a renewable energy solution.
Cherry obtained an engineering report to design and install a 245kW large-scale solar PV system with high wattage panels maximising energy production at MDI’s head office and state of the art manufacturing facility. After completing the solar installation, MDI are now saving of $75,000, 313,452 kWh and a whopping 401,218 kg of carbon emissions per annum.