Recognising the significance of environmental responsibility, Brentwood pledged to achieve net zero emissions by 2050 in the Victorian government’s ‘Take 2’
campaign. Cherry was recommended to Brentwood by Northcote High on account of our reputation and reliability. Brentwood’s installation was unique as they required an integration of two solar systems. Additionally, the installation had to be completed within a short time frame during school holidays to avoid disruption to students.
Cherry Energy Solutions undertook a vigorous planning and design process to ensure the two solar systems were compatible for power generation and monitoring. A strict schedule was pivotal in making sure the installation was completed during the school holidays. With 170 x 405W SunPower panels and Fronius inverters, Brentwood
Secondary College’s system is saving 84,881kWh and 108,647kg CO2 per annum, with $387,000 saved over the life of the system.
CASE STUDIES
Related projects.
LATEST NEWS
Ours insights& creative ideas
Check out the latest in Cherry news from our newest projects to industry insights.
Supplied Products







